Fire Station 22 Presentation | Design Commission

May 10, 2024

If the district is adding a unique use that is not allowed by right within the Central Business district zone, they may need to go through the Planned Development process with planning commission and City Council reviews and approvals. 576648e32a3d8b82ca71961b7a986505. Fire Station Building Committee Meeting Minutes – April 10, 2014. The sequence is surrounded by trees on the west side and the purpose of their being there (the apparatus bay) on the east. Click to expand document information.

  1. Fire station design pdf
  2. Fire station construction plans
  3. Fire station floor plans pdf 2017 2018
  4. Fire station floor plans pdf 2017
  5. Fire station floor plans pdf document

Fire Station Design Pdf

Main Entry Rendering Employee parking is on the south end of the site next to the cell tower. Employee Parking Rendering After parking, employees enter using a covered walkway that takes them from the individual status of the parking lot to the collective status of the living quarters. Reward Your Curiosity. Part of the area is covered with fans, and the other part is open to sky. Agenda for Pre-Bid Conference – Central Fire Station. Oct. 27, 2021: Durango Fire Protection District representatives met with city staff for an initial discussion on the district's conceptual plan for the Durango School District 9R building. March 3, 2022: The fire district is hosting a public form from 6 to 8 p. m. on Thursday, March 10, 2022.

Fire Station Construction Plans

Search inside document. Report this Document. RFP Ad for Owners Project Manger – Central Fire Station. Corner of Riverside and Faro Rendering Signage and massing combine to make a welcoming, intuitive, and easy-to-find entry. Items on the agenda: Discussion on alternate location to be considered for Downtown Fire Station. Large windows to the west focus on collective gathering spaces that help to create a home-away- from-home atmosphere. Training Facility Projected Budget. View the full agenda and recording of the meeting at There was no public comment. The district was informed that the city's Land Use and Development Code requires the following plans and studies for the project submittal: Site Specific Development Plan (Major if more than 10, 000 sf of new building area is added). Meditation Areas Rendering The exterior lighting reinforces the idea of this being a 24-hour facility that serves as a beacon of safety to the surrounding neighborhood. Healing Nature of the Living Quarters Rendering The day room opens to an outdoor dining and grilling area. Description: The new station could be built at the site of a small playground. Transition From South to North Rendering The living quarters face the grove of trees on the north side of the site. Addendum 2 to the Designer RFP.

Fire Station Floor Plans Pdf 2017 2018

This is in keeping with the concept of technology being on the opposite end of the site from the trees which represent nature. 298-acre piece of property at 201 E 12th St., outlined below in solid yellow, from Durango School District 9R. Traffic Study with Truck Routing Plan. Fire Chief Hal Doughty presented an overview of the draft project to staff but said the project is not ready to be formally submitted to the city yet. Share this document. This property contains the 9R administration building and the Durango Big Picture High School. Updated Existing Conditions Plan – Fire Station Headquarters – 99 Main Street. Fire Station Building Committee Approved Building Layout – September 4th, 2014.

Fire Station Floor Plans Pdf 2017

You are on page 1. of 3. The Durango Fire Protection District has purchased a 3. 0% found this document not useful, Mark this document as not useful. 0% found this document useful (0 votes). The city is not a buyer or seller of the 9-R administration building. Save Floor plans for new Reading fire station at Ninth... For Later. Connection Between Inside and Out Rendering Each day room has an indention in the façade that opens to an outdoor mediation area perfect for decompressing from the stress caused by going out on a call. The agenda includes a presentation from Chief Hal Doughty and moderated questions and answers from pre-submitted questions.

Fire Station Floor Plans Pdf Document

Original Title: Full description. Share on LinkedIn, opens a new window. Fire Station 22 Presentation — original pdf. Nighttime View Questions and Discussion WestEast Design Group, LLC Architectural, Interior Design, Planning Mechanical, Electrical + Plumbing 210. Diagram Concept Showing how the concept came together on the site with the individual and technology issues to the south by the cell tower and the collective, nature, and healing areas to the north by the grove of trees. Water Study/Spill Cleanup – 99 Main Street. Discussion about the Historic Designation of the School Building. Share with Email, opens mail client. The fire district's offer to buy the 9-R administration building is a transaction between the school district and the fire district. Front Façade Rendering The main entry is on axis with the employee entrance coming off the secure parking lot creating a direct connection between the building occupants and the public. Collins Center Public Safety Facility Report on PowerPoint. Contacts: The Durango Fire Protection District Board members asked the City of Durango make their phone numbers available to the public: Fire Station Building Committee Projected Timeline by Reinhardt Associates.

If the project adds more than 10, 000 square feet of new building area, the district would need a Major Site Plan Review Process with a Planning Commission review; or. Back-illuminated signage connotes pride, purpose, and 24- hour visibility. No application has been submitted yet. No decision were made. PDF, TXT or read online from Scribd. Training Facility Sub Committee Meeting Minutes – November 18, 2015. Grading and Drainage Plan.